Rehabilitation of the coach 218 has been underway for two years now. This comprehensive project is addressing nearly every aspect of this 1912-built coach to prepare it for its return…
The Train Shed is now beginning to take shape. On Tuesday, December 22, 2009 subcontractor CHG Building Systems began erecting steel columns for the Train Shed. CHG is not a…
“On, Comet! On, Cupid! On, Donner and Blitzen!” may have a better ring than “On, Weyerhaeuser Timber #6! On, Coach NP X-46 and Caboose NP 1203!” But train, not sleigh,…
Chapel Car 5 Messenger of Peace has been awarded a prestigious Save America’s Treasures grant. On 9 December 2009 the Institute of Museum and Library Services – in collaboration with…
The Train Shed construction is continuing to proceed but some of the most impressive work takes place in a manufacturing facility. Take the steel columns and girders as an example,…